CLICK HERE FOR PRINTABLE VERSION
The Peak Completions IsoPort CS™ provides wellbore control in remedial operations by offering zonal shutoff. The system maintains the operational simplicity, time and cost savings of ball drop methods.
Each sleeve is initially opened utilizing Peak’s proven ball and seat technology that allows multiple stages to be treated with a continuous pumping time. After all sleeves are shifted open, seats can be milled out to allow for zones to be closed or re-opened utilizing one of Peak’s advanced shifting tool options which are suited for various applications.
The IsoPort CS™ provides a more efficient system for production and completion processes by eliminating profile erosion during high frac rate treatments. The tool is drillable in the closed and open position and has an internal lock system to prevent spinning during mill out.
The IsoPort CS™ provides operators with the ability to maximize reservoir recovery by shutting off zones that are producing excess water or unwanted gas. It is an ideal solution for reaching production with less time, money, and resources. Additionally, it can be combined with a variety of Peak technologies including the rigless toe initiation sleeve and the F1 Fantom® dissolvable ball.
PRODUCT HIGHLIGHTS
DESIGN FEATURES
TEMPERATURE RATING | STANDARD PRESSURE RATING | STANDARD CASING | MAX STAGES | |||
psi | MPa | in | mm | Openhole | Cemented | |
HPHT Adaptable | 10,000 | 69 | 4.5 | 114.3 | 24 | 15 |
5.5 | 139.7 | 36 | 15 |
NOTE: ADDITIONAL SIZES AND HPHT VERSIONS AVAILABLE